Giacomo Checchin wrote
The project I developed is set timewise in 2012: it is a retrospective project that respects criteria and objectives that the client set out but doesn’t avoid the design aspects connected to safety and fire prevention, whose costs are made economically viable through an extension of the tower itself. The